Washington Gas contractor, Resurface Inc., will begin resurfacing work throughout the town on Monday, September 30, 2024, weather permitting. Please observe all posted signs.
The work will include the following locations:
• 1604 Woodhill Ct. at Woodhill Dr.
• 2270 Beaver Rd. at Columbia Park Rd.
• 15 Cheverly Cir. at Parkway
• 3022 Lake Ave. at Inwood St.
Resurface Contact Information:
Jesse Leach
Jesse@resurfaceva.com
703-565-8001
Cheverly Public Works Contact Information:
301-773-2666; option 1